02Nov2016
Final Commissioning phase in Paranal, Chile for the VLT-DSM system
19Jun2015
Microgate (member of AdOptica consortium with ADS International) has signed the contract for the final design and construction of the forth adaptive mirror (M4) of the E-ELT Telescope.
23Dec2013
The MagAO team announced the discovery of a new planet, named HD 106906 b
23Aug2013
Thanks to Microgate's technology, astronomers can now view objects in the sky at unprecedented sharpness in visible light.
28Mar2013
Come to visit us at our booth in Florence
18Feb2013
The VLT-DSM is now under Test at ESO-Garching
06Dec2012
Additional commitments bring giant telescope closer
23May2012
ESO has taken a further step towards the construction of the European Extremely Large Telescope (E-ELT) by awarding to Microgate and other partner the preliminary design study contract for the adaptive fourth mirror (M4) of the E-ELT.
14May2012
In Paranal (Chile), Eso is getting the VLT ready to install our DSM system
22Mar2012
ANSA (Agenzia Nazionale Stampa Associata), and INAF (National Institute for Astrophysics) talk about the LBT Adaptive Secondary Mirror Project
23Oct2011
Science Festival 2011 - Genoa (Italy)
21Jul2011
The sytem of the Adaptive Deformable Mirror of VLT is in the Microgate Clean Room
17Jun2010
Adaptive mirrors controlled by Microgate real time systems, produce first incredibile results